the construction of a primary sedimentation tank and an anaerobic digestion tank are dispensed with. Moreover by chosing the discontinuous method of operation the separation of the sludge from the purified effluent can be achieved in the ditch itself, and hence the construction of a secondary sedimentation tank will not be needed.